- See EV Meter Submittal Checklist. Complete checklist.
- Contact the City of Lodi’s building department (209-333-6714) for permit requirements. Or, click here for Construction Permit Application (PDF). And, click here for Checklist for Expedited Residential Electric Vehicle Charging Station Permit (PDF).
- Commercial installations require a Construction Permit Application. The Checklist for Expedited Residential Electric Vehicle Charging Station Permit does not apply.
- Applications must be postmarked no later than 180 days after the purchase of the Level 2 charger.
- This program has a limited budget. Applications will be accepted on a first come, first served basis, until funds are depleted.
- The level 2 charger must be installed at the residential dwelling unit or commercial location receiving electric power from Lodi Electric Utility.
- Qualifying Level 2 (240-volt) charger must be: new and unused; certified by Underwriters Laboratories Inc. (UL Listed); ETL Listed; or approved by the City of Lodi Building Department. Chargers that are portable, resold, rebuilt, received from warranty insurance claims, or new parts installed in existing units are not eligible for rebates under this program. The Level 2 charger must be wall-mounted and installed by a licensed contractor.
- Incomplete applications will be rejected. Applications must include all required information.
Before submitting your application, make sure you have the following:
- Lodi Electric utility account number
- Submitted and received approval of your EV Meter before applying for the building permit
- Receipts or invoices
- Final building/meter permit
- Read and sign customer acknowledgement.