Apply For Your Rebate
Submit your RESIDENTIAL online application here for:
- Zero Emission EV
- Level 2 Charger
- Level 2 Charger Certified Installation
Submit your COMMERCIAL online application here for:
- Level 2 Charger purchase
- Level 2 Charger certified installation
- DC Fast Charger purchase (includes Multifamily housing)
- DC Fast Charger certified installation (includes Multifamily housing)
Terms and Conditions
Lodi Electric Vehicle Charger Rebate Terms & Conditions (PDF)
EV Charging Rate
13.20.325 - Schedule EV—Electric vehicle charging service.
A. Applicability. This schedule is applicable to single-phase electric vehicle charging service in single-family and multi-family dwellings separately metered by the city.
B. Rates:
Customer Charge ..... $3.00
Energy Charge:
EV Charging period (per kWh) | Schedule EA Tier 1 - $0.1428 / kWh |
Non-EV Charging period (per kWh) | Schedule EA Tier 3 - $0.3366 / kWh |
C. Energy Cost Adjustment (ECA). An energy cost adjustment shall be included in each bill for service as provided in Section 13.20.180 Schedule ECA—Energy cost adjustment.
D. Billing Cycle Charge (Monthly Bill). The billing cycle charge is the sum of the customer charge, the energy charge and the ECA.
E. Definition of Time Periods:
Times of the day are defined as follows:
- EV Charging period: 8:00 p.m. to 6:00 a.m. Monday through Friday (and all day weekends and holidays).
- Non-EV Charging period: 6:00 a.m. to 8:00 p.m. Monday through Friday (excluding weekends and holidays).
- (Ord. No. 1941, § 1, 5-3-2017)
EV Meter Specification
Electric Vehicle Meter Submittal Checklist (PDF): Please note. You must be pre-approved for a new EV Meter installation. Follow the instructions on this application before applying for your building/meter permit. A pre-inspection by LEU Engineering staff is required when a separate meter is installed for an EV charging station.